Answer extracted from the Pegasus Radio podcast — listen to the full episode below.
The construction industry faces massive, unaddressed productivity issues that will force it into crisis within five to ten years unless urgently fixed. Without improvement in industrialisation and efficiency, the sector risks grinding to a halt regardless of how solutions are framed—whether through offsite technology, digitisation, or structural alliances.
Jamie Hillier identifies a fundamental gap between what the industry needs and what it's currently delivering. The problem isn't theoretical: it's a capacity crisis disguised as a technical one. As explained in the episode, productivity levels determine whether projects stay profitable and whether the sector can meet future demand.
Accaloft emerged from this diagnosis. Founded in late 2019—just before the pandemic—the firm operates across three core service streams designed to bridge the gap between strategic vision and on-site reality. These span social value and ESG compliance, modern methods of construction (MMC) and industrialisation advice, and commercial management. The three streams are deliberately woven together, not siloed, because productivity fixes require simultaneous attention to delivery, value capture, and stakeholder alignment.
Hillier's perspective comes from nearly twenty years as a tier one major contractor, where he advanced from site QS to pre-construction director managing estimating, digital design, planning, and site operations for major projects. That front-line experience shaped his core insight: poor productivity isn't a failure of intention or capability—it's a failure of integration. Teams optimise their own function without accounting for upstream or downstream impact, and by the time problems surface on-site, the financial and schedule damage is already done.
"If we do not fix, we're going to be in a real mess in five or ten years. The industry is almost going to go out of control."
Jamie Hillier — Co-founder and Partner, Accaloft. After nearly two decades as a pre-construction director at a tier one major contractor, Hillier co-founded Accaloft with two partners to embed better practices at the earlier stages of project development, leveraging his hands-on experience in estimating, digital design, planning, and site delivery to shift how construction aligns productivity with profitability.
The real tension, as discussed at length in the podcast, is that the productivity challenge isn't new. It persists because the industry treats solutions as specialist add-ons rather than foundational disciplines. Offsite construction, digital twins, supply chain management—none of these unlock value in isolation. They only work when integrated into earlier project phases, where strategy meets delivery.
Hillier frames the crisis with urgency because the window for preventative action is closing. Projects already operating at tight margins have little room to absorb inefficiency. Without deliberate, systemic improvement in how work is planned, sequenced, and executed, the sector will face a cascade of project failures, margin compression, and labour shortages that ripple across the entire supply chain.
This is why Accaloft's three-strand approach addresses not just delivery method but also the commercial and social context in which delivery happens. The episode explores in detail how government clients—Ministry of Justice, MHCLG—and healthcare trusts are now expecting contractors and consultants to embed productivity improvements while simultaneously meeting social value and ESG targets. The challenge is synthesising all three without compromising any.
Accaloft works with government departments including the Ministry of Justice and MHCLG, healthcare trusts and new hospital programs, contractors, and SME organisations across multiple sectors seeking to embed better delivery practices.
Accaloft is deliberate about growth ambitions and focuses on three core principles: working with people they enjoy, working on interesting projects, and maintaining financial stability with six months of cash reserves before scaling staff.
Jamie observed a clear correlation between greater adoption of prefabrication and offsite construction methods and more successful or profitable project delivery outcomes at his former tier one contractor.